In-House Staging

IN-HOUSE STAGING

After the Control Panel is built, it undergoes thorough in-house testing, including Factory Acceptance Tests (FAT). We invite you to come see the Control Panel in full operation and confirm that it's in proper working order before moving forward. This is your chance to conduct a final quality assurance check, or sign off on the final product. Once everything is in order, we'll make arrangements to safely ship the panel to its final destination for installation and commissioning.

What is included?

  • Equipment assembly, setup, and testing:
  • Instrumentation preassembly
  • Machine testing
  • Panel point-to-point
  • Multiple panel system staging
  • Factory acceptance testing